Menu

Opportunities

The Interstate 5 North Coast Corridor project will create many employment, vendor and subcontracting opportunities for companies like yours. Flatiron-Skanska-Stacy and Witbeck, a Joint Venture (“FSSW”) is looking to partner with firms that can provide a broad range of potential services.

Proposal Timeline

Construction Phase: 2017 – 2024

Potential Scopes of Work for the Construction Phase*

  • Articulated Concrete Block
  • Asphalt Paving
  • Biological Monitoring
  • Bridge Concrete Barrier
  • Bridge Demolition
  • Channel Lining
  • CIDH Pile
  • Clear and Grub
  • Cold Plane Asphalt
  • Concrete Supply
  • Construction Area Signs
  • Driven Pile
  • Electrical
  • Environmental Compliance Officer
  • Erosion Control
  • GRE Wall Materials
  • Grind Existing Concrete Pavement
  • Ground Anchors and Soil Nails
  • Guardrail
  • Habitat Restoration
  • Hydrographic Surveys
  • Jack and Bore
  • Joint Seal
  • Landscape and Irrigation
  • Masonry
  • Minor Concrete
  • Miscellaneous Metal
  • Miscellaneous Iron and Steel
  • Overhead Signs
  • Pipe Supply
  • Quality Control
  • Railroad Signals
  • Railroad Track Materials
  • Reinforcing Steel
  • Revegetation and Planting
  • Rip Rap
  • Roadside Signs
  • Roadway Concrete Barrier
  • Shotcrete
  • Slope Protection
  • Striping
  • Survey
  • SWPPP
  • Transparent Soundwalls

*The potential scopes of work listed above are not a complete list of work opportunities that will be available. Additional details and breakdown of the scopes of work into smaller packages will be made available as design is finalized and GMPs are issued for bid.

NCC Plan